
Atlantic City’s Pacific Ave Project Delayed
The goal was to have Pacific Ave re-paved by the end of the year.
Now, we're just going to have to wait till spring before we can actually rollerblade on a smooth Pacific Ave. Not that you would actually rollerblade on that street, but it would be smooth enough to do so.
Officials say that the delay is because of the early drop in temperatures. The temperature of the pavement needs to be at least 32 degrees during construction. So, until spring, watch out for those potholes.
More From SoJO 104.9 FM









